Medical College of the Kraków-Prokocim University Hospital

A modern complex of 13 hospital and diagnostic buildings with a floor area of approximately 120,000.00 m2. About 120 km of installed piping, 949 beds, 24 operating theatres, a teaching centre with an auditorium for 250 people.

Scope of installation works:
– heating and cooling systems,
– gas supply system for steam humidifiers,
– water supply and sewage system (building L).

Completion: 2017 – 2019 r.

Location:

Kraków,
ul. Jakubowskiego/
Kostaneckiego

Category:

Public utility building (hospital)

Investor:

Jagiellonian University – Medical College

General contractor:

Consortium of
WARBUD S.A./ PORR S.A./VAMED Polska sp. z o.o.

Consortium Leader:

WARBUD S.A.

Completed by:

TKT Engineering sp. z.o.o. Warsaw Branch