Construction of Mercedes-Benz’s first engine factory in Poland, which is located in the Lower Silesian Economic Activity Zone.
Scope of installation works:
– ventilation,
– water supply and sewage system,
– gaseous fire suppression system,
– heating system,
– industrial and process cold chilled water supply system,
– compressed air system.
Completion: 2018 – 2020
Location:
Jawor, ul. Daimlera
Category:
Production hall
Investor:
Mercedes-Benz Manufacturing Poland sp. z o.o.
General contractor:
Consortium of Strabag/TKT/Elektromontaż
Consortium leader:
Strabag sp. z o.o.
Completed by:
TKT Engineering, Poznań Branch